Crystal Motel
Select date
-
Select date
1 night
1 room, 2 adults, 0 children
All properties in Red Bluff
Crystal Motel
Motel
333 S Main St, Red Bluff, California, 96080, United States
Show on map
We Price Match







Amenities
ParkingFree
Front desk (limited hours)
English
No smoking in public areas
All amenities
Property Description
With a stay at CRYSTAL MOTEL in Red Bluff, you'll be within a 15-minute walk of Sacramento River and Kelly-Griggs House Museum. This motel is 1.6 mi (2.5 km) from St. Elizabeth Community Hospital and 2.7 mi (4.4 km) from Tehama District Fairgrounds.
Show more
7.4/10
Cleanliness7.4
Amenities7.4
Location7.4
Service7.4
All 17 reviews
Surroundings
Airport: Red Bluff Municipal Airport
(4.4 km)
Airport: Redding Regional Airport
(41.8 km)
View on map
Overview
Rooms
Guest Reviews
Services & Amenities
Policies

4
Standard Double Room
2 Queen bed
Has window
Free Wi-Fi
Non-smoking
Air conditioning
Private bathroom
Cable channels
LCD TV
Check Availability

6
Standard Room
1 Queen bed
Has window
Free Wi-Fi
Non-smoking
Air conditioning
Private bathroom
Cable channels
LCD TV
Check Availability
Guest Reviews
7.4/10
17 reviews

- Cleanliness7.4
- Amenities7.4
- Location7.4
- Service7.4
Average for similar properties in Red Bluff

Guest User
February 21, 2025

I think this Motel was quaint, old style for the price was a great deal. Front desk Personnel was absolutely wonderful helpful and pleasant. The staff around the motel were always saying hello. If you're expecting a mansion don't go to this Motel. If you want your money's worth, wonderful place to stay, got ideas of where to have dinner which were great. Anytime I plan a trip back to California I will be staying at the Crystal Motel. Only thing I would say maybe the floors could have been dusted a little bit better. Other than that I have nothing negative to say about this hotel.

Amanda
January 29, 2025

The front desk ppl were very nice!!

ANdrea
January 28, 2025

It was quiet, the rooms were clean, staff was nice, but there were people running around the parking lot and coming in and out all night. Nobody bothered our vehicle, but it was a little unsettling..

Gary
January 27, 2025

Had a problem with itching on my body after being in bed for 30 minutes. So I packed up an check out and went to another motel. Manager would not give a refund without going trough ******* first. So I am working on a refund.

David
October 17, 2024

Place is a bit older, but very clean with everything in good repair! Newer and comfortable beds. The desk staff was exceptional!… Including being honest about the area and where to park. Excellent rates, best in the area by far!

Brittany
September 25, 2024

The owner was extremely rude and derogatory.

hui-ying
September 16, 2024

Every thing is ok, The bed is a bit soft .

peter
September 5, 2024

The smell of mothballs and perfume were overwhelming, left in the first hour.

Rostislav
August 30, 2024

Good
Services & Amenities
Most Popular Amenities
Parking
Free
More Amenities
Parking
Parking
Free
Front Desk Services
Front desk (limited hours)
Languages Spoken
English
Public Areas
No smoking in public areas
Property Policies
Check-in and Check-out Times
Check-in: 15:00–23:00
Check-out: Before 11:00
Front desk hours: [Mon-Sun]08:00–22:00
If you will arrive outside of check-in hours, contact the property in advance
Pets
Pets are not allowed
Service Animals
Service animals are allowed
Age Requirements
The main guest checking in must be at least 21 years old
Paying at the Hotel
Managed by a Private Host
This property is managed by a private host. A private host refers to a party who rents one or more properties for purposes not related to their trade, business, or profession.
Property Description
- Number of Rooms: 42
With a stay at CRYSTAL MOTEL in Red Bluff, you'll be within a 15-minute walk of Sacramento River and Kelly-Griggs House Museum. This motel is 1.6 mi (2.5 km) from St. Elizabeth Community Hospital and 2.7 mi (4.4 km) from Tehama District Fairgrounds.
The front desk is staffed during limited hours. Free self parking is available onsite.
Make yourself at home in one of the 42 air-conditioned rooms featuring LCD televisions. Complimentary wireless internet access keeps you connected, and cable programming is available for your entertainment. Conveniences include blackout drapes/curtains and desk chairs, as well as phones with free local calls.
The front desk is staffed during limited hours. Free self parking is available onsite.
Make yourself at home in one of the 42 air-conditioned rooms featuring LCD televisions. Complimentary wireless internet access keeps you connected, and cable programming is available for your entertainment. Conveniences include blackout drapes/curtains and desk chairs, as well as phones with free local calls.
Frequently Asked Questions
What is the cancellation policy for Crystal Motel?
The cancellation policy for Crystal Motel varies depending on the type of room and booking conditions.What is the cancellation policy for Crystal Motel?
What are the check-in and check-out times at Crystal Motel?
Standard check-in time at Crystal Motel is 15:00-23:00 and check-out time is 11:00.What are the check-in and check-out times at Crystal Motel?
Can I bring my pet inside the Crystal Motel?
As much as we love pets, unfortunately, we are unable to accommodate them in Crystal Motel.Can I bring my pet inside the Crystal Motel?
How far is the Crystal Motel from the closest airport?
The closest airport is Red Bluff Municipal Airport, and it is about 7 mins from hotel by car (4.4 km).How far is the Crystal Motel from the closest airport?
About This Property
Nearest Airport | Red Bluff |
---|---|
Distance to Airport | 4.36KM |
Average Price From | PHP4834 |
Hotel Star Rating | 2 |